| 1. |
|
Z-Clip- Aluminum z-clip is installed into the wall in 8' lengths at the top of the pad height. 2 small sections of z-clip are then attached to the back of the pad (at a consistent height on all pads). The wall pad is then "hung" on the z- clip. The wall pad is then anchored directly through the bottom nailing margin into the wall. It is also recommended to squirt some liquid nails or similar adhesive in the middle of the back of the wall pad. This will ensure that the pad is secured at the top, middle and bottom. |
|
 |
Completed Installation with Z-Clips |
|